SCK•CEN authors are displayed in bold

Title: Development of an in-pile HLM materials test loop for BR2
Author(s): Heyse, Jan
Caers, Ben
Dierckx, Marc
Fernandez, Rafaël
Janssens, Joël
Schuurmans, Paul
Dementjev, Sergei
Wagner, Werner
Laffont, Guy
Keywords: MTR+I3
MTR-I3
VELLA
MTR
HLM
heavy liquid metal
lead bismuth eutectic
BR2
loop
irradiation
corrosion
neutron
feasibility
design
mock-up
Issue Date: Mar-2010
Publication type: In-proceedings paper
Citation: Heyse J., Caers B., Dierckx M., Fernandez R., Janssens J., Schuurmans P., e.a.- Development of an in-pile HLM materials test loop for BR2.- In: HeLiMeRT 2009 - Fifth edition of the International Workshop on Materials for Heavy Liquid Metal cooled Reactors and Related Technologies - Proceedings, Mol, Belgium, 20-22 April 2009 / SCK•CEN, Mol, Belgium, SCK•CEN, 2010, p. 63-67
Abstract: In the framework of WP 3.2 of the MTR+I3 project SCK•CEN has performed a feasibility and design study for the construction of a Heavy Liquid Metal (HLM) loop in one of the irradiation channels of the BR2 reactor. The pupose of this loop is to study combined effect of the exposure to flowing HLM (liquid lead bismuth eutectic) and the irradiation with neutrons on materials of interest. In the framework of the VELLA project a mock-up test of the HLM loop will be performed. The results of the feasibility study and the final design are presented as well as the planned mock-up tests.
Persistent URL: http://hdl.handle.net/10038/1405  Help icon

Items in this repository are protected by copyright, with all rights reserved, unless otherwise indicated.