Title: Accelerator Driven Systems for Transmutation: Main Design Achievements of the XT-ADS and EFIT Systems within the FP6 IP-EUROTRANS Integrated Project
Author(s): De Bruyn, Didier
Larmignat, Sophie
Woaye-Hune, Antony
Mansani, Luigi
Rimpault, Gérald
Artioli, Carlo
Keywords: MYRRHA
ADS
design
FP6
EUROTRANS
Issue Date: 13-Jun-2010
Publication type: In-proceedings paper
Citation: De Bruyn D., Larmignat S., Woaye-Hune A., Mansani L., Rimpault G., Artioli C.- Accelerator Driven Systems for Transmutation: Main Design Achievements of the XT-ADS and EFIT Systems within the FP6 IP-EUROTRANS Integrated Project.- In: International Congress on Advances in Nuclear Power Plants ICAPP'10, San Diego, Ca, United States, 13-17 June 2010, La Grange Park, Il, United States, American Nuclear Society, 2010, p. 1808-1816
Abstract: In the frame of the 6th European Framework Programme, the IP_EUROTRANS integrated project aims to design by a step by step approach an European Transmutation Demonstrator (ETD). This demonstrator is based on a fast-spectrum reactor driven by an accelerator and working in sub critical mode. The main design achievements of the IP_EUROTRANS project and the remaining issues identified by the partners are presented in the paper for the two machines studied, XT-ADS and EFIT: the objectives assigned to both machines are obtained (an optimum transmutation level for EFIT, a satisfactorily flexibility for installing experiments in high-flux locations for XT-ADS), their respective concepts being still able to respond to feasibility and safety requirements. Recommendations for future work are also provided, in particular for the new project CDT (Central Design Team), launched recently in the frame of the 7th European Framework Programme and that is described in a separate communication.
Persistent URL: http://hdl.handle.net/10038/7203  Help icon
ISBN: 978-0-89448-081-2