Construction of the MYRRHA injector

Research output: Contribution to report/book/conference proceedingsIn-proceedings paper

Documents & links

Abstract

A collaboration of SCK•CEN, IAP and BEVATECH GmbH is currently constructing the room temperature CH section of the 16.6 MeV CW proton injector for the MYRRHA project. The elaboration of all the construction readiness files for the construction of the accelerating cavities of the first CH section (1.5 to 5.9 MeV) is ongoing. In parallel, the planning, development and fabrication of all further components of this accelerator section is in progress, while the full study for the remaining section is under preparation. This contribution is documenting the most recent status.

Details

Original languageEnglish
Title of host publicationProceedings of IPAC2017, Copenhagen, Denmark
Subtitle of host publication04 Hadron Accelerators - A08 Linear accelerators
Pages2221-2223
Number of pages3
DOIs
Publication statusPublished - 16 May 2017
Event2017 - IPAC: 8th International Particle Accelerator Conference. - Copenhagen, Denmark
Duration: 14 May 201719 May 2017
Conference number: TUPVA062

Conference

Conference2017 - IPAC
CountryDenmark
CityCopenhagen
Period2017-05-142017-05-19

Keywords

  • MYRRHA accelerator, accelerator injector, MINERVA

ID: 4842294