MYRRHA accelerator driven sytem programme: Recent progress and perspectives

Research output: Contribution to report/book/conference proceedingsIn-proceedings paper

Documents & links

DOI

Abstract

The purpose of the MYRRHA programme is to demonstrate the ADS concept at pre-industrial scale, to prove the transmutation efficiency in ADS and to serve as a flexible and multipurpose irradiation facility. The MYRRHA sub-critical core fueled with highly enrichedMOX fuel and cooled with LBE will be operated by a high-power superconducting linear accelerator delivering a proton beam of 600 MeV, 4 mA to an LBE spallation target. In September 2018, the Belgian government has approved the construction of the MYRRHAfacility and its operation until 2038. In this paper, we describe the present status of the MYRRHA programme and the perspectives for implementation through a first infrastructure in 2026 to the full MYRRHA operation in 2036.

Details

Original languageEnglish
Title of host publicationNuclear Power Engineering
Pages1-13
Number of pages13
DOIs
Publication statusPublished - 2019

Publication series

NameNuclear Power Engineering Ru
Volume2
ISSN (Print)0204-3327

Keywords

  • Accelerator driven system, Lead-bismuth, Superconducting linear accelerator

ID: 7070122