Superconducting LINAC design upgrade in view of the 100 MeV MYRRHA phase I

Research output: Contribution to report/book/conference proceedingsIn-proceedings paperpeer-review

Standard

Superconducting LINAC design upgrade in view of the 100 MeV MYRRHA phase I. / Gatera, Angélique; Bouly, Frédéric; Baylac, Maud; Uriot, Didier.

10th International Particle Accelerator Conference: IPAC2019, Melbourne, Australia. JACoW Publishing, 2019. p. 837-840.

Research output: Contribution to report/book/conference proceedingsIn-proceedings paperpeer-review

Harvard

Gatera, A, Bouly, F, Baylac, M & Uriot, D 2019, Superconducting LINAC design upgrade in view of the 100 MeV MYRRHA phase I. in 10th International Particle Accelerator Conference: IPAC2019, Melbourne, Australia. JACoW Publishing, pp. 837-840, 2019 - IPAC, Melbourne, Australia, 2019-05-19. https://doi.org/10.18429/JACoW-IPAC2019-MOPTS003

APA

Gatera, A., Bouly, F., Baylac, M., & Uriot, D. (2019). Superconducting LINAC design upgrade in view of the 100 MeV MYRRHA phase I. In 10th International Particle Accelerator Conference: IPAC2019, Melbourne, Australia (pp. 837-840). JACoW Publishing. https://doi.org/10.18429/JACoW-IPAC2019-MOPTS003

Vancouver

Gatera A, Bouly F, Baylac M, Uriot D. Superconducting LINAC design upgrade in view of the 100 MeV MYRRHA phase I. In 10th International Particle Accelerator Conference: IPAC2019, Melbourne, Australia. JACoW Publishing. 2019. p. 837-840 https://doi.org/10.18429/JACoW-IPAC2019-MOPTS003

Author

Gatera, Angélique ; Bouly, Frédéric ; Baylac, Maud ; Uriot, Didier. / Superconducting LINAC design upgrade in view of the 100 MeV MYRRHA phase I. 10th International Particle Accelerator Conference: IPAC2019, Melbourne, Australia. JACoW Publishing, 2019. pp. 837-840

Bibtex - Download

@inproceedings{e8f5e1c1a39d477eb5b557de93bb2d30,
title = "Superconducting LINAC design upgrade in view of the 100 MeV MYRRHA phase I",
abstract = "The goal of the MYRRHA project is to demonstrate the technical feasibility of transmutation in a 100 MWth Accelerator Driven System by building a new flexible irradiation complex at Mol (Belgium). The MYRRHA facility requires a 600 MeV accelerator delivering a maximum proton current of 4 mA in continuous wave operation, with an additional requirement for exceptional reliability. Supported by SCKCEN and the Belgium government the project has entered in its phase I (MINERVA): the construction of the linac first part, up to 100 MeV. We review the design updates of the superconducting linac.",
keywords = "MINERVA, Cold Linac, Single spoke Linac, Design",
author = "Ang{\'e}lique Gatera and Fr{\'e}d{\'e}ric Bouly and Maud Baylac and Didier Uriot",
note = "Score=3; 2019 - IPAC : 10th International Particle Accelerator Conference, IPAC2019 ; Conference date: 19-05-2019 Through 24-05-2019",
year = "2019",
month = may,
day = "20",
doi = "10.18429/JACoW-IPAC2019-MOPTS003",
language = "English",
pages = "837--840",
booktitle = "10th International Particle Accelerator Conference",
publisher = "JACoW Publishing",
url = "https://ipac19.org/, https://ipac19.org",

}

RIS - Download

TY - GEN

T1 - Superconducting LINAC design upgrade in view of the 100 MeV MYRRHA phase I

AU - Gatera, Angélique

AU - Bouly, Frédéric

AU - Baylac, Maud

AU - Uriot, Didier

N1 - Score=3

PY - 2019/5/20

Y1 - 2019/5/20

N2 - The goal of the MYRRHA project is to demonstrate the technical feasibility of transmutation in a 100 MWth Accelerator Driven System by building a new flexible irradiation complex at Mol (Belgium). The MYRRHA facility requires a 600 MeV accelerator delivering a maximum proton current of 4 mA in continuous wave operation, with an additional requirement for exceptional reliability. Supported by SCKCEN and the Belgium government the project has entered in its phase I (MINERVA): the construction of the linac first part, up to 100 MeV. We review the design updates of the superconducting linac.

AB - The goal of the MYRRHA project is to demonstrate the technical feasibility of transmutation in a 100 MWth Accelerator Driven System by building a new flexible irradiation complex at Mol (Belgium). The MYRRHA facility requires a 600 MeV accelerator delivering a maximum proton current of 4 mA in continuous wave operation, with an additional requirement for exceptional reliability. Supported by SCKCEN and the Belgium government the project has entered in its phase I (MINERVA): the construction of the linac first part, up to 100 MeV. We review the design updates of the superconducting linac.

KW - MINERVA

KW - Cold Linac

KW - Single spoke Linac

KW - Design

UR - https://ecm.sckcen.be/OTCS/llisapi.dll/overview/39432089

U2 - 10.18429/JACoW-IPAC2019-MOPTS003

DO - 10.18429/JACoW-IPAC2019-MOPTS003

M3 - In-proceedings paper

SP - 837

EP - 840

BT - 10th International Particle Accelerator Conference

PB - JACoW Publishing

T2 - 2019 - IPAC

Y2 - 19 May 2019 through 24 May 2019

ER -

ID: 6866028