The MYRRHA ADS project in Belgium enters the Front End Engineering Phase

Research output: Contribution to report/book/conference proceedingsIn-proceedings paper

Standard

The MYRRHA ADS project in Belgium enters the Front End Engineering Phase. / De Bruyn, Didier; Aït Abderrahim, Hamid; Baeten, Peter; Fernandez, Rafaël; Engelen, Jeroen; Van den Eynde, Gert; Michiels, Sidney (Peer reviewer).

Proceedings of the 2014 International Congress on Advances in Nuclear Power Plants (ICAPP14). Vol. 1 La Grange Park, Il, United States, 2014. p. 646-654.

Research output: Contribution to report/book/conference proceedingsIn-proceedings paper

Harvard

De Bruyn, D, Aït Abderrahim, H, Baeten, P, Fernandez, R, Engelen, J, Van den Eynde, G & Michiels, S 2014, The MYRRHA ADS project in Belgium enters the Front End Engineering Phase. in Proceedings of the 2014 International Congress on Advances in Nuclear Power Plants (ICAPP14). vol. 1, La Grange Park, Il, United States, pp. 646-654, 2014 - ICAPP - International Congress on Advances in Nuclear Power Plants, Charlotte, NC, United States, 2014-04-06.

APA

De Bruyn, D., Aït Abderrahim, H., Baeten, P., Fernandez, R., Engelen, J., Van den Eynde, G., & Michiels, S. (2014). The MYRRHA ADS project in Belgium enters the Front End Engineering Phase. In Proceedings of the 2014 International Congress on Advances in Nuclear Power Plants (ICAPP14) (Vol. 1, pp. 646-654). La Grange Park, Il, United States.

Vancouver

De Bruyn D, Aït Abderrahim H, Baeten P, Fernandez R, Engelen J, Van den Eynde G et al. The MYRRHA ADS project in Belgium enters the Front End Engineering Phase. In Proceedings of the 2014 International Congress on Advances in Nuclear Power Plants (ICAPP14). Vol. 1. La Grange Park, Il, United States. 2014. p. 646-654

Author

De Bruyn, Didier ; Aït Abderrahim, Hamid ; Baeten, Peter ; Fernandez, Rafaël ; Engelen, Jeroen ; Van den Eynde, Gert ; Michiels, Sidney. / The MYRRHA ADS project in Belgium enters the Front End Engineering Phase. Proceedings of the 2014 International Congress on Advances in Nuclear Power Plants (ICAPP14). Vol. 1 La Grange Park, Il, United States, 2014. pp. 646-654

Bibtex - Download

@inproceedings{3e517964125742f0bcb30971b2b9de0a,
title = "The MYRRHA ADS project in Belgium enters the Front End Engineering Phase",
abstract = "The MYRRHA project started in 1998 by SCK•CEN. MYRRHA is a MTR, based on the ADS concept, for material and fuel research, for studying the feasibility of transmutation of Minor Actinides and Long-Lived Fission Products arising from radioactive waste reprocessing and finally for demonstrating at a reasonable power scale the ADS principle. The MYRRHA design has progressed through various framework programmes of the European Commission in the context of Partitioning and Transmutation and has been presented at every ICAPP congress since 2010. The design has now entered into the Front End Engineering Phase (FEED) covering the period 2012-2015. The engineering company, which will handle this phase, has been selected and the works have begun in the late 2013. In the mean time we have made some refinements in both primary systems and plant layout, including reactor building design. In this paper, we present the most recent developments of the MYRRHA design in terms of reactor building and plant layout as existing today as well as a preliminary study concerning the spent fuel building of the facility. During the oral presentation we will add some preliminary results of the FEED interaction and the most recent version of the primary systems.",
keywords = "MYRRHA, ADS, primary system, FEED",
author = "{De Bruyn}, Didier and {A{\"i}t Abderrahim}, Hamid and Peter Baeten and Rafa{\"e}l Fernandez and Jeroen Engelen and {Van den Eynde}, Gert and Sidney Michiels",
note = "Score = 3",
year = "2014",
month = "4",
language = "English",
isbn = "978-0-89448-460-5",
volume = "1",
pages = "646--654",
booktitle = "Proceedings of the 2014 International Congress on Advances in Nuclear Power Plants (ICAPP14)",

}

RIS - Download

TY - GEN

T1 - The MYRRHA ADS project in Belgium enters the Front End Engineering Phase

AU - De Bruyn, Didier

AU - Aït Abderrahim, Hamid

AU - Baeten, Peter

AU - Fernandez, Rafaël

AU - Engelen, Jeroen

AU - Van den Eynde, Gert

A2 - Michiels, Sidney

N1 - Score = 3

PY - 2014/4

Y1 - 2014/4

N2 - The MYRRHA project started in 1998 by SCK•CEN. MYRRHA is a MTR, based on the ADS concept, for material and fuel research, for studying the feasibility of transmutation of Minor Actinides and Long-Lived Fission Products arising from radioactive waste reprocessing and finally for demonstrating at a reasonable power scale the ADS principle. The MYRRHA design has progressed through various framework programmes of the European Commission in the context of Partitioning and Transmutation and has been presented at every ICAPP congress since 2010. The design has now entered into the Front End Engineering Phase (FEED) covering the period 2012-2015. The engineering company, which will handle this phase, has been selected and the works have begun in the late 2013. In the mean time we have made some refinements in both primary systems and plant layout, including reactor building design. In this paper, we present the most recent developments of the MYRRHA design in terms of reactor building and plant layout as existing today as well as a preliminary study concerning the spent fuel building of the facility. During the oral presentation we will add some preliminary results of the FEED interaction and the most recent version of the primary systems.

AB - The MYRRHA project started in 1998 by SCK•CEN. MYRRHA is a MTR, based on the ADS concept, for material and fuel research, for studying the feasibility of transmutation of Minor Actinides and Long-Lived Fission Products arising from radioactive waste reprocessing and finally for demonstrating at a reasonable power scale the ADS principle. The MYRRHA design has progressed through various framework programmes of the European Commission in the context of Partitioning and Transmutation and has been presented at every ICAPP congress since 2010. The design has now entered into the Front End Engineering Phase (FEED) covering the period 2012-2015. The engineering company, which will handle this phase, has been selected and the works have begun in the late 2013. In the mean time we have made some refinements in both primary systems and plant layout, including reactor building design. In this paper, we present the most recent developments of the MYRRHA design in terms of reactor building and plant layout as existing today as well as a preliminary study concerning the spent fuel building of the facility. During the oral presentation we will add some preliminary results of the FEED interaction and the most recent version of the primary systems.

KW - MYRRHA

KW - ADS

KW - primary system

KW - FEED

UR - http://knowledgecentre.sckcen.be/so2/bibref/11394

M3 - In-proceedings paper

SN - 978-0-89448-460-5

VL - 1

SP - 646

EP - 654

BT - Proceedings of the 2014 International Congress on Advances in Nuclear Power Plants (ICAPP14)

CY - La Grange Park, Il, United States

ER -

ID: 118370