The MYRRHA Project in Belgium: Status after the Two First Years of Basic Engineering Work

Research output: Contribution to report/book/conference proceedingsIn-proceedings paper

Standard

The MYRRHA Project in Belgium: Status after the Two First Years of Basic Engineering Work. / De Bruyn, Didier; Aït Abderrahim, Hamid; Baeten, Peter; Leysen, Paul.

International Congress on Advanced Power Plants ICAPP15. Vol. 1 France, 2015. p. 856-864.

Research output: Contribution to report/book/conference proceedingsIn-proceedings paper

Harvard

De Bruyn, D, Aït Abderrahim, H, Baeten, P & Leysen, P 2015, The MYRRHA Project in Belgium: Status after the Two First Years of Basic Engineering Work. in International Congress on Advanced Power Plants ICAPP15. vol. 1, France, pp. 856-864, 2015 - ICAPP - International Congress on Advances in Nuclear Power Plants , Nice, France, 2015-05-03.

APA

De Bruyn, D., Aït Abderrahim, H., Baeten, P., & Leysen, P. (2015). The MYRRHA Project in Belgium: Status after the Two First Years of Basic Engineering Work. In International Congress on Advanced Power Plants ICAPP15 (Vol. 1, pp. 856-864). France.

Vancouver

De Bruyn D, Aït Abderrahim H, Baeten P, Leysen P. The MYRRHA Project in Belgium: Status after the Two First Years of Basic Engineering Work. In International Congress on Advanced Power Plants ICAPP15. Vol. 1. France. 2015. p. 856-864

Bibtex - Download

@inproceedings{827d546094aa4bc98f284ed738796c42,
title = "The MYRRHA Project in Belgium: Status after the Two First Years of Basic Engineering Work",
abstract = "The MYRRHA project started in 1998 by SCK•CEN. MYRRHA is a Material Testing Reactor (MTR), based on the Accelerator Driven System (ADS) concept, for material and fuel research, for studying the feasibility of transmutation of Minor Actinides and Long-Lived Fission Products arising from radioactive waste reprocessing and finally for demonstrating at a reasonable power scale the principle of the ADS. The MYRRHA design has progressed through various framework programmes of the European Commission in the context of Partitioning and Transmutation. The design has now entered into the Front End Engineering Phase (FEED) covering the period 2012-2015. The engineering company, which will handle this phase, has been selected and the works have begun in the late 2013. In the meantime we have made some progress in the licensing process. In this paper, we present the most recent developments of the MYRRHA design and our current experience with the Belgian safety authority FANC (Federal Agency for Nuclear Control).",
keywords = "ADS, subcritical, fast reactor, engineering, licensing",
author = "{De Bruyn}, Didier and {A{\"i}t Abderrahim}, Hamid and Peter Baeten and Paul Leysen",
note = "Score = 3",
year = "2015",
month = "5",
language = "English",
volume = "1",
pages = "856--864",
booktitle = "International Congress on Advanced Power Plants ICAPP15",

}

RIS - Download

TY - GEN

T1 - The MYRRHA Project in Belgium: Status after the Two First Years of Basic Engineering Work

AU - De Bruyn, Didier

AU - Aït Abderrahim, Hamid

AU - Baeten, Peter

AU - Leysen, Paul

N1 - Score = 3

PY - 2015/5

Y1 - 2015/5

N2 - The MYRRHA project started in 1998 by SCK•CEN. MYRRHA is a Material Testing Reactor (MTR), based on the Accelerator Driven System (ADS) concept, for material and fuel research, for studying the feasibility of transmutation of Minor Actinides and Long-Lived Fission Products arising from radioactive waste reprocessing and finally for demonstrating at a reasonable power scale the principle of the ADS. The MYRRHA design has progressed through various framework programmes of the European Commission in the context of Partitioning and Transmutation. The design has now entered into the Front End Engineering Phase (FEED) covering the period 2012-2015. The engineering company, which will handle this phase, has been selected and the works have begun in the late 2013. In the meantime we have made some progress in the licensing process. In this paper, we present the most recent developments of the MYRRHA design and our current experience with the Belgian safety authority FANC (Federal Agency for Nuclear Control).

AB - The MYRRHA project started in 1998 by SCK•CEN. MYRRHA is a Material Testing Reactor (MTR), based on the Accelerator Driven System (ADS) concept, for material and fuel research, for studying the feasibility of transmutation of Minor Actinides and Long-Lived Fission Products arising from radioactive waste reprocessing and finally for demonstrating at a reasonable power scale the principle of the ADS. The MYRRHA design has progressed through various framework programmes of the European Commission in the context of Partitioning and Transmutation. The design has now entered into the Front End Engineering Phase (FEED) covering the period 2012-2015. The engineering company, which will handle this phase, has been selected and the works have begun in the late 2013. In the meantime we have made some progress in the licensing process. In this paper, we present the most recent developments of the MYRRHA design and our current experience with the Belgian safety authority FANC (Federal Agency for Nuclear Control).

KW - ADS

KW - subcritical

KW - fast reactor

KW - engineering

KW - licensing

UR - http://ecm.sckcen.be/OTCS/llisapi.dll/open/ezp_139511

UR - http://knowledgecentre.sckcen.be/so2/bibref/12624

M3 - In-proceedings paper

VL - 1

SP - 856

EP - 864

BT - International Congress on Advanced Power Plants ICAPP15

CY - France

ER -